roma road 
tyseley 
birmingham 
b11 2jh 

t: 0121 7081188 
f: 0121 7063390 

click here to download product brochure                                                                                            home :: profile :: services :: clients :: contact 

 
 heat treatment
 trace heating
 treatment furnaces

 
fire protection:
 fire barriers
 blast walls
 archival vaults
 cable ducts

 
products:
 impact board
 hf board
 sl board
 gp board

  SL Board: Thermal Soffit Liner for exposed and semi-exposed areas
 

 

Direct Fix to Concrete Soffit



Fixings:
Fixing Centres:

Fixing Method:

 



Ejot DDS minimum 20mm penetration into concrete.
Nominal 600mm on perimeter and in field for
negative wind loads not exceeding 0.35kN/m2.
Pre-drill SL Board and concrete to a depth of the anchor length + 5mm, insert fixing and screw tight to "line and level".


Fixing to Treated Timber Battens




Timber Battens:
Batten Size:
Batten Fixings:
Board Fixings:
Edge Spacing:



Timber treated to BS5268: Pt5.
Minimum 50mm x 38mm.
Sutable ejot fixing 70mm at 500mm nominal centres.
Screws at nominal 600mm centres.
Minumim 12mm from edge. Min. 35mm from corner.

Fixing to Metal Furring Section




Furring Cestion:
Fixing:

Board Fixing:
Edge Spacing:




Steel tophat section (0.7mm gauge).
Ejot at 400mm centres each side of metal section staggered by 200mm.
Suitable ejot fixing screws at nominal 600mm centres.
Minumum 12mm from edge. Min. 35mm from corner.

 
 
Page: 1 2 3 4 5 6

copyright © kemwell thermal limited 2009                                                                                                            designed and hosted by stephen turner